SOLARTODO/ SMART CITY
Six platforms · One operating system

AI-Native Smart-City Installations, Engineered in Jiangsu Since 2014.

Six product families — Coastal, CIGS, Family IP, Sky Hub, Iconic, Selfie — all running SOLARTODO-OS™. From a $750 off-grid coastline pole to a $2M heritage monument, we engineer the form your project demands.

The Moon, On Demand · Every module optional · Every vision buildable

Certifications & compliance

  • CE
  • RoHS
  • IEC
  • IP66
  • IK10
  • SASO
  • INMETRO
  • BIS

Solutions by sector

Engineered for global cities. Optimized for the Gulf.

Every project starts with a use case, not a SKU. We route inquiries by sector to the engineering lead who has shipped that environment before.

  • Smart City & Industrial

    Edge AI, drone docking, V2G microgrid, NB-IoT mesh — turning streetlights into municipal infrastructure nodes.

    Sky Hub · CIGS

  • Coastal & Defense

    Hybrid wind-solar with maglev VAWT, marine-grade hot-dip galvanizing, Starlink uplink, IP68 buried battery.

    Coastal Series

  • Heritage & Cultural

    Cultural-monument smart pillars, brass-cast finials, AR storytelling, NFC tourist passport integration.

    Iconic Series

  • Family & Tourism

    10 animal-IP forms, sensor-driven sound and color, viral-share towers — the lights that everyone photographs.

    Family IP · Selfie

Configuration Guides

Solutions & Configuration Guides

Market analysis and configuration guides based on real RFQ requirements. From Saudi Vision 2030 heritage districts to Latin American theme parks — we engineer the form your project demands. Pilot Program open for the first customers in each market.

View all configuration guides

Procurement FAQ

Lead time, MOQ, certs, payment — straight answers.

Sourced from the questions Ethan answers most often across MENA, LATAM, SEA, and EU procurement teams.

What is the typical lead time?
Standard SKUs ship in 30-45 days FOB Asia main port. Custom configurations 60-90 days. Drawing approval and SASO/CE certification cycles add separately.
What is the MOQ?
Typically 10 units for standard products. Sample units available at higher unit price. Larger projects (≥500 units) qualify for tiered discounts and dedicated production scheduling.
Which countries do you certify for?
CE, RoHS, IEC, UL, and SAA cover most platforms. SASO (Saudi Arabia) is in scope for 5 of 6 platforms. INMETRO (Brazil) and BIS (India) on request.
Do you offer OEM/ODM?
Yes. Send your spec sheet to [email protected] — we reply within 48 hours with a feasibility note and a preliminary quote.
What are payment terms?
Standard: LC 30/70 or TT 30/70. Larger projects negotiable on a case-by-case basis. We do not require letters of credit for repeat customers.
Do you support installation?
Engineering drawings and an installation guide ship with every order. On-site supervision is available for orders larger than 500 units.

Direct line to engineering

Talk to engineering — not a chatbot.

Ethan handles every inquiry personally. Two business-day reply window across MENA, LATAM, SEA, and EU. WhatsApp is fastest.

WhatsApp +86 158 5167 6607 · [email protected] · HQ +6585559114